Add to Cart
Heavy Mountain Bridge / Emergency Bridge / Mechanized Bridge With 60t / 17t Load
Heavy Mountain Bridge is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle. It is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.
|
Specifications for Heavy Mountain Bridge |
|
|
Tracked load / axle load |
55t / 17t |
|
Outline dimension (L*W*H) |
13*3.3*3.6m |
|
Gross weight |
32.5t |
|
Bridge weight |
10.5t |
|
Bridge length |
21m |
|
Negotiating length (on hard banks) |
19m |
|
Section length |
10.63m |
|
Bridge width (when expanding) |
3.3m |
|
Track width |
1.15m |
|
Section height |
0.95m |
|
End section height |
0.35m |
|
Operator |
2-3 |
|
Erection time |
10 min |
|
Max. longitudinal slope / lateral slope |
±10% / ±5% |
|
Allowable bank height difference |
5% |