
Add to Cart
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.
Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.
Pictures of Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers
FAQ
1,How about quality control of your company?
Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.
2,Are you a factory or a trade company?
We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.
3,Where is your loading port?
Shanghai Port,Nanjing Port,Tianjin Port.
Specifications of Less Operators: 2-3 Wheeled Load-13t Mechanized Bridge | |
Tracked load / axle load | 60t / 13t |
Outline dimension (L*W*H) | 13*3.3*3.6m |
Bridge length | 21m |
Negotiating length (on hard banks) | 19m |
Gross weight | 32.5t |
Bridge weight | 10.5t |
Section length | 10.63m |
Bridge width (when expanding) | 3.3m |
Track width | 1.15m |
Section height | 0.95m |
End section height | 0.35m |
Operator | 2-3 |
Erection time | 10 min |
Max. longitudinal slope / lateral slope | ±10% / ±5% |
Allowable bank height difference | 5% |