CHINA HARZONE INDUSTRY CORP.,LTD.

CHINA HARZONE INDUSTRY CORP.,LTD. PROVIDE ASSURANCE AND SUCCESS TO CUSTOMERS. ESTABLISH INDUSTRY-LEADING EMERGENCY EQUIPMENT BRAND IN CHINA.

Manufacturer from China
Verified Supplier
13 Years
Home / Products / Bailey Bridge /

Width 4.2m Bailey Bridge Modular Steel Bridge

Contact Now
CHINA HARZONE INDUSTRY CORP.,LTD.
Visit Website
City:wuhan
Province/State:hubei
Country/Region:china
Contact Person:MsSun Ruyu
Contact Now

Width 4.2m Bailey Bridge Modular Steel Bridge

Ask Latest Price
Video Channel
Brand Name :Harzone
Certification :ISO9001:2015
Place of Origin :CHINA HUBEI WUHAN
MOQ :1set
Price :Negotiated
Supply Ability :50000 Ton/Tons per Year
Grade :Q345
Type :Steel Girder Bridges
Application :Emergency Bridges
Processing Service :Bending, Cutting, Welding, Decoiling,Punching
Certificate :ISO9001
Color :any color you want
Structure type :Steel Truss Bridge
Installation :Engineers Guidance
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Width 4.2m Modular Steel Bridge Bridge Bailey Bridge

Width 4.2m Modular Steel Bridge Bridge Bailey Bridge Description:

Width 4.2m Modular Steel Bridge Bridge Bailey Bridge is moveable steel bridge ,It has been extensively used in several fields, the bridge most essential feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be rapidly accomplished with humble tools and manpower.

Width 4.2m Modular Steel Bridge Bridge Bailey Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. Width 4.2m Modular Steel Bridge Bridge Bailey Bridge surface protection can be paint or hot-dip galvanized.

Width 4.2m Modular Steel Bridge Bridge Bailey Bridge Specifications:

Type CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

The simple component of Width 4.2m Modular Steel Bridge Bridge Bailey Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. The girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. The deck is combined of transom, bridge plate and kerb. The frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. Width 4.2m Modular Steel Bridge Bridge Bailey Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.

Width 4.2m Bailey Bridge Modular Steel Bridge

Width 4.2m Bailey Bridge Modular Steel BridgeWidth 4.2m Bailey Bridge Modular Steel Bridge

The company's emergency transport engineering equipment plays an important role in the disaster relief in Songhua River and Zhouqu, Gansu Province.

At 12:30 noon on August 5,2010, a military engineering regiment of the Shenyang Military Region successfully erected a 183-meter emergency floating bridge made by Huazhou heavy industry in the UND river section of the Songhua River Jilin City River as the last shore boat docked with the river bank, through the flood-interrupted Jilin to Yongji, rock, Huadian Direction of the life of the passage, a large number of relief supplies smoothly through the pontoon, rushed to the disaster area.

The bridge is Jilin City's only route to the hard-hit cities of Yongji, Iwaki and Huadian. On July 28, the great flood destroyed this life passage, once causing traffic paralysis in Guillon, causing great difficulties for rescue and relief work as well as the travel of citizens. On the morning of August 4, when Premier Wen Jiabao was inspecting flood control and flood control work in Jilin City, he made a special trip to Wende Bridge to check on the disaster situation and ordered that this major artery of traffic should be blocked as soon as possible to restore normal traffic order. After more than 3 hours of tenacious struggle, 183 meters pontoon successfully completed. The Pontoon is a two-way two-lane bridge with a maximum carrying capacity of 50 tons of vehicles, which can reach the road transport capacity of the windward bridge before it crashes.

Inquiry Cart 0